-
颁布单位: |
颁布时间:2006 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Cost, Notes]
-
颁布单位: |
颁布时间:1955 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Cost, Notes]
-
颁布单位: |
颁布时间:1954 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Ideas, Cost, Notes]
-
颁布单位: |
颁布时间:1951 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Cost, Notes, General Electric Company]
-
颁布单位: |
颁布时间:1951 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Cost, Results, Notes, General Electric Company]