-
颁布单位:[Stellenbosch University] |
颁布时间:2014 |
实施时间:2014 |
学科分类:[["UCTD",, "Dissertations, --, Health, sciences, education",, "Theses, --, Health, sciences, education",, "Nursing, --, Simulation, methods",, "Nursing, --, Study, and, teaching, --, Lesotho",, "Simulated, patients",, "Nurses, --, Training, of, --, Lesotho, --, Methodology, --, Evaluation"]]
-
颁布单位: |
颁布时间:1967 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, International, Methodology, Training, F. Sherwin Collection, Profit Improvement Engineering Sanford, N.C.]
-
颁布单位: |
颁布时间:1966 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Training, Methodology, Radio Corporation Of America (Rca), Camden, Nj]
-
颁布单位: |
颁布时间:1966 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Training, Methodology, General Dynamics, Convair Division]
-
颁布单位: |
颁布时间:1962 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Methodology, Training, International, F. Sherwin Collection., The Plessey Company Limited (Essex, England)]
-
颁布单位: |
颁布时间:1961 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Training, Methodology, General Electric Company, Value Service]
-
颁布单位: |
颁布时间:1960 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Training, Methodology, General Electric Company, Value Service]
-
颁布单位: |
颁布时间:1959 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Methodology, Results, Training, General Electric Company, Advanced Value Research, Value Service]
-
颁布单位: |
颁布时间:1954 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Methodology, Training, General Electric Company, Value Service, Materials Department]
-
颁布单位: |
颁布时间:1952 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Methodology, Training, National Association Of Purchasing Agents]