已收录 272962 条政策
检索结果
已选条件:
solar power
2010

<符合条件的数据共:1条>
排序方式
登录后可批量下载(统一登录激活码登录)

  • 颁布单位:[University of Waterloo] |  颁布时间:2010 |  实施时间:2010 |  学科分类:[component based architecture, prefabricated architecture, off-site fabrication, solar decathlon, high-performance building, solar power, exhibition houses, design for disassembly, extended producer responsibility, life-cycle analysis, building industry waste, adaptable architecture, demountable architecture, responsive architecture, mass customization, Architecture]
    预览  |  原文链接    [浏览:52 下载:8]