-
颁布单位: |
颁布时间:1957 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Training, Notes, General Electric Company]
-
颁布单位: |
颁布时间:1954 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Training, International, Notes]
-
颁布单位: |
颁布时间:1952 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, Training, History, Notes, Value Analysis Unit, Materials Services Department, General Electric Co.]
-
颁布单位: |
颁布时间:1952 |
实施时间: |
学科分类:[Value Analysis (Cost Control), Economic Engineering, History, Development, Training, Notes, General Electric Company Schenectady, Ny]