已收录 268921 条政策
 政策提纲
  • 暂无提纲
Utility advanced turbine systems (ATS) technology readiness testing
[摘要] The overall objective of the Advanced Turbine System (ATS) Phase 3 Cooperative Agreement between GE and the US Department of Energy (DOE) is the development of a highly efficient, environmentally superior, and cost-competitive utility ATS for base-load utility-scale power generation, the GE 7H (60 Hz) combined cycle power system, and related 9H (50 Hz) common technology. The major effort will be expended on detail design. Validation of critical components and technologies will be performed, including: hot gas path component testing, sub-scale compressor testing, steam purity test trials, and rotational heat transfer confirmation testing. Processes will be developed to support the manufacture of the first system, which was to have been sited and operated in Phase 4 but will now be sited and operated commercially by GE. This change has resulted from DOE's request to GE for deletion of Phase 4 in favor of a restructured Phase 3 (as Phase 3R) to include full speed, no load (FSNL) testing of the 7H gas turbine. Technology enhancements that are not required for the first machine design but will be critical for future ATS advances in performance, reliability, and costs will be initiated. Long-term tests of materials to confirm design life predictions will continue. A schematic of the GE H machine is shown.
[发布日期] 2000-09-15 [发布机构] Federal Energy Technology Center (U.S.)
[效力级别]  [学科分类] 
[关键词] Heat Transfer;Power Generation;Testing;24 Power Transmission And Distribution;Turbines [时效性] 
   浏览次数:16      统一登录查看全文      激活码登录查看全文