UTILITY ADVANCED TURBINE SYSTEMS (ATS) TECHNOLOGY READINESS TESTING PHASE 3 RESTRUCTURED (3R)
[摘要] Much of the ''H'' technology design is based on proven, established technologies. The major technologies of the combined cycle powertrain, including the bearing designs, the evaluation methods for rotor dynamics, the compressor and turbine blading designs, and the generator field construction methods are all either direct applications of proven design technology or evolutionary refinement of existing designs. It is for these reasons that GE expects that the reliability of the new ''H'' Class generating system will be fully commensurate with the levels associated with today's ''F'' Class combined cycle power plants. With maintenance and operations performed at ''best practice'' levels, the new ''H'' Class plant should reach its full reliability potential of 97.0% or better.
[发布日期] 2000-09-01 [发布机构] Federal Energy Technology Center (U.S.)
[效力级别]  [学科分类] 
[关键词] Testing;Bearings;Construction;Compressors;Turbines [时效性] 
   浏览次数:16      统一登录查看全文      激活码登录查看全文