已收录 268921 条政策
 政策提纲
  • 暂无提纲
ENVIRONMENTAL ASSESSMENT FOR THE PROPOSED WITHDRAWAL OF PUBLIC LANDS WITHIN AND SURROUNDING THE CALIENTE RAIL CORRIDOR, NEVADA
[摘要] The purpose for agency action is to preclude surface entry and the location of new mining claims, subject to valid existing rights, within and surrounding the Caliente rail corridor as described in the Yucca Mountain FEIS (DOE 2002). This protective measure is needed to enhance the safe, efficient, and uninterrupted evaluation of land areas for potential rail alignments within the Caliente rail corridor. The evaluation will assist the DOE in determining, through the Rail Alignment environmental impact statement (EIS) process, whether to construct a branch rail line, and to provide support to the BLM in deciding whether or not to reserve a ROW for the rail line under the Federal Land Policy and Management Act (FLPMA). The BLM participated as a cooperating agency in preparing this EA because it is the responsible land manager and BLM staff could contribute resource specific expertise.
[发布日期] 2005-12-01 [发布机构] United States. Department of Energy. Yucca Mountain Project Office.
[效力级别]  [学科分类] 
[关键词] Public Lands;Management;Mining;29 Energy Planning, Policy And Economy;Alignment [时效性] 
   浏览次数:14      统一登录查看全文      激活码登录查看全文