LANMAS Gap Analysis Report
[摘要] In July, 2000, the Controlled Materials Accountability and Tracking System (COMATS) Team, with the assistance of a representative of the Local Area Network Materials Accountability System (LANMAS) development team from Savannah River, performed an evaluation to enumerate and qualify differences between the current LANMAS functionality and LLNL requirements as implemented by COMATS. The differences found range from minor to serious deficiencies of LANMAS in relation to current LLNL MC&A practice. Therefore, we recommend a gradual integration of LANMAS into a hybrid system which uses LANMAS to satisfy DOE/NNSA MC&A and reporting requirements and uses COMATS to satisfy LLNL-specific MC&A and operational requirements.
[发布日期] 2000-08-25 [发布机构] Lawrence Livermore National Laboratory
[效力级别] [学科分类]
[关键词] Local Area Networks;Hybrid Systems;Reporting Requirements;Evaluation;99 General And Miscellaneous//Mathematics, Computing, And Information Science [时效性]