已收录 268921 条政策
 政策提纲
  • 暂无提纲
CH Packaging Operations Manual
[摘要] Introduction - This procedure provides instructions forassembling the following CH packaging payload: Drum payload assembly Standard Waste Box (SWB) assembly Ten-Drum Overpack (TDOP)
[发布日期] 2006-12-18 [发布机构] Waste Isolation Pilot Plant (N.M.)
[效力级别]  [学科分类] 
[关键词] Transport Trailer;Wipp;Flange;Wastes;Dunnage Drums [时效性] 
   浏览次数:11      统一登录查看全文      激活码登录查看全文