Final Technical Report
[摘要] The Phase I program met or exceeded all the program goals. During the Phase I program, CCR personnel communicated directly with Dr. Al Moretti at Fermilab concerning the design and specifications. Results of the Phase I program were also presented at the MUON Accelerator Conference in Berkeley, California in February 2005. This review of the design by accelerator scientists provided additional verification of the approach and predicted performance. Results for specific program tasks are described below. In addition, CCR performed a preliminary investigation for a 10 MW device at the request of personnel at Fermi National Laboratory. Results of that task are also provided.
[发布日期] 2005-12-01 [发布机构] Calabazas Creek Research, Inc.
[效力级别] [学科分类]
[关键词] 43 Particle Accelerators;Personnel;Verification Klystron, Multiple Beam;Design;Specifications [时效性]