Acceptance Test Procedure for New Pumping Instrumentation and Control Skid U
[摘要] This Acceptance Test Procedure (ATP) provides for the inspection and testing of the new Pumping Instrumentation and Control (PIC) skid designed as ''U''. The ATP will be performed after the construction of the PIC skid in the fabrication shop.
[发布日期] 2000-12-05 [发布机构] CH2M Hill Hanford Group, Inc.
[效力级别] [学科分类]
[关键词] 12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;Storage Facilities;Performance Testing;Measuring Instruments;Waste Retrieval [时效性]