已收录 268921 条政策
 政策提纲
  • 暂无提纲
Cold Vacuum Drying (CVD) Facility Electrical System Captor and Dapper Study
[摘要] The objective of this report is to Validate and as-build the Load and Fault hand calculations performed by Meier Associates. Perform a protective device coordination study, not performed by Meier's, and furnish any recommendations, including recommended device settings. Perform Transient Motor Starting (TMS) analysis for the chillers and also the motors on the standby generator system. Indicate any design problems or NEC Code Violations, if found.
[发布日期] 2000-11-20 [发布机构] Fluor Hanford, Inc.
[效力级别]  [学科分类] 
[关键词] Calculation Methods;Vacuum Systems;Power Distribution Systems;Recommendations;Drying [时效性] 
   浏览次数:20      统一登录查看全文      激活码登录查看全文