已收录 268920 条政策
 政策提纲
  • 暂无提纲
As-Built Verification Plan Spent Nuclear Fuel Canister Storage Building MCO Handling Machine
[摘要] This as-built verification plan outlines the methodology and responsibilities that will be implemented during the as-built field verification activity for the Canister Storage Building (CSB) MCO HANDLING MACHINE (MHM). This as-built verification plan covers THE ELECTRICAL PORTION of the CONSTRUCTION PERFORMED BY POWER CITY UNDER CONTRACT TO MOWAT. The as-built verifications will be performed in accordance Administrative Procedure AP 6-012-00, Spent Nuclear Fuel Project As-Built Verification Plan Development Process, revision I. The results of the verification walkdown will be documented in a verification walkdown completion package, approved by the Design Authority (DA), and maintained in the CSB project files.
[发布日期] 2000-10-19 [发布机构] Fluor Hanford, Inc.
[效力级别]  [学科分类] 
[关键词] Storage;Administrative Procedures;11 Nuclear Fuel Cycle And Fuel Materials;Construction;Nuclear Fuels [时效性] 
   浏览次数:40      统一登录查看全文      激活码登录查看全文