已收录 268921 条政策
 政策提纲
  • 暂无提纲
CH Packaging Operations for High Wattage Waste at LANL
[摘要] This procedure provides instructions for assembling the following contact-handled (CH) packaging payloads: - Drum payload assembly - Standard Waste Box (SWB) assembly - Ten-Drum Overpack (TDOP) In addition, this procedure also provides operating instructions for the TRUPACT-II CH waste packaging. This document also provides instructions for performing ICV and OCV preshipment leakage rate tests on the following packaging seals, using a nondestructive helium (He) leak test: - ICV upper main O-ring seal - ICV outer vent port plug O-ring seal - OCV upper main O-ring seal - OCV vent port plug O-ring seal.
[发布日期] 2003-05-06 [发布机构] Waste Isolation Pilot Plant (N.M.)
[效力级别]  [学科分类] 
[关键词] Manuals;Leak Testing Doe;12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;Tdop;Alpha-Bearing Wastes [时效性] 
   浏览次数:38      统一登录查看全文      激活码登录查看全文