CMIR/PCR/FRR for Closure of SRL Seepage Basins Operable Unit (904-53G1, -53G2, -54G, and -55G)
[摘要] The purpose of this Corrective Measures Implementation Report/Post-Construction Report/Final Remediation Report (CMIR/PCR/FRR) is to document compliance with technical and statutory requirements and to provide a consolidated record of all removal and remedial activities that have taken place during implementation of the selected corrective measure/remedial action for the Savannah River Laboratory Seepage Basins (SRLSBs) at the Savannah River Site (SRS).
[发布日期] 2002-07-31 [发布机构] Savannah River Site (S.C.)
[效力级别] [学科分类]
[关键词] Settling Ponds;Documentation;Remedial Action;11 Nuclear Fuel Cycle And Fuel Materials;Savannah River Plant [时效性]