Spent Nuclear Fuel (SNF) Removal Campaign Plan
[摘要] The overall operation of the Spent Nuclear Fuel Project will include fuel removal, sludge removal, debris removal, and deactivation transition activities. Figure 1-1 provides an overview of the current baseline operating schedule for project sub-systems, indicating that a majority of fuel removal activities are performed over an approximately three-and-one-half year time period. The purpose of this document is to describe the strategy for operating the fuel removal process systems. The campaign plan scope includes: (1) identifying a fuel selection sequence during fuel removal activities, (2) identifying MCOs that are subjected to extra testing (process validation) and monitoring, and (3) discussion of initial MCO loading and monitoring in the Canister Storage Building (CSB). The campaign plan is intended to integrate fuel selection requirements for handling special groups of fuel within the basin (e.g., single pass reactor fuel), process validation activities identified for process systems, and monitoring activities during storage.
[发布日期] 2000-08-07 [发布机构] Fluor Hanford, Inc.
[效力级别]  [学科分类] 
[关键词] Removal;Sludges;Storage;Testing;Monitoring [时效性] 
   浏览次数:62      统一登录查看全文      激活码登录查看全文