Operational Test Report (OTR) for U-105 Pumping and Instrumentation and Control (PIC) Skid
[摘要] Attached is the completed Operation Test Procedure (OTP-200-004, Rev. A-18). OTP includes a print out of the Programmable Logic Controller (PLC) Ladder Diagram. Ladder Diagram was designed for installation in the PLC used to monitor and control pumping activity for Tank Farm 241-U-105. The completed OTP and OTR are referenced in the IS PIC Skid Configuration Drawing (H-2-829998).
[发布日期] 2000-02-28 [发布机构] CH2M Hill Hanford Group, Inc.
[效力级别] [学科分类]
[关键词] Pumping;Waste Retrieval;Storage Facilities;Computerized Control Systems;Performance Testing [时效性]