Area 2 Bitcutter and Post-Shot Injection Wells: Corrective Action Unit 90 Post-Closure Inspection Annual Report
[摘要] Area 2 Bitcutter and Post-Shot Containment Shop Injection Wells Corrective Action Unit (CAU) 90 Post-Closure Monitoring requirements are described in section V.B.8.b of the Nevada Test Site Resource Conservation and Recovery Act Permit for a Hazardous Waste Management Facility No. NEV HW009, modified May 31, 1997, Revision 3. Post-closure care consists of the following: Semiannual inspections of the unit using an inspection checklist; Photographic documentation; Field note documentation; and Preparation and submittal of an annual report. The report includes copies of the inspection checklist, photographs, and recommendations and conclusions. The Post-Closure Inspection Checklists are found in Attachment A, a copy of the field notes is found in Attachment B, and a copy of the inspection photographs is found in Attachment C.
[发布日期] 2000-09-01 [发布机构] Bechtel Nevada Corporation
[效力级别] [学科分类]
[关键词] Monitoring;Waste Management;Documentation;Sanitary Landfills;Nevada Test Site [时效性]