已收录 268921 条政策
 政策提纲
  • 暂无提纲
Waste Analysis Plan for 241-Z
[摘要] The 241-2 waste tanks are used to store, treat, and transfer waste to Tank Farms. The sampling requirements are established to identify the composition of the tank waste. The primary goal is to meet the Tank Farms acceptance criteria. Tank Farms will not accept waste without extensive characterization sample data. Process and lab wastes are sampled for suitability prior to routing to Tk-D8. The samples are helpful in tracking the amount of chemical constituents to determine treatment and are required to maintain Pu inventory and criticality prevention limitations. Likewise, the waste is sampled prior to inter-tank transfers. The revised Waste Analysis Plan for 241-2 (WAP) contains current facility, process and waste descriptions. The WAP lists the Double Shell Tank (DST) system acceptance criteria, sampling parameters and required analyses. The characterization data on historical process wastes was deleted. A section on the Tank Farms waste approval procedural process was added to describe the steps necessary and documentation required to transfer waste to the DST system. Failure to collect proper samples will result in Tank Farms' refusal to accept PFP waste until proper sampling conditions are met. This will use up unnecessary time and resources but not place the plant in a hazardous position.
[发布日期] 2000-04-21 [发布机构] Fluor Hanford, Inc.
[效力级别]  [学科分类] 
[关键词] Chemical Composition;Certification;Radioactive Wastes;Sampling;Storage Facilities [时效性] 
   浏览次数:14      统一登录查看全文      激活码登录查看全文