已收录 268921 条政策
 政策提纲
  • 暂无提纲
Busted Butte Phase II Excavation Analysis
[摘要] The purpose of this analysis is to provide an engineering excavation and ground support design for the Busted Butte phase II mine back. The analysis will apply engineering practices and previous proven design methods for pillar design and ground support in accordance with applicable Integrated Safety Management principles and functions. The scope of this analysis is limited to the Busted Butte Test Facility. The intended use of this analysis is to provide testing excavation boundaries, ground support and pillar design input to drawing(s) to support test operations implementation. This design activity has been prepared under ''Technical Work Plan For Test Facilities Design FY01 Work Activities'' (TWP) (CRWMS M&O 2000b). No deviations from the TWP have been necessary for this analysis.
[发布日期] 2000-11-29 [发布机构] United States. Department of Energy. Yucca Mountain Project Office.
[效力级别]  [学科分类] 
[关键词] Radioactive Waste Disposal;Strata Control;Excavation;Design;Underground Facilities [时效性] 
   浏览次数:12      统一登录查看全文      激活码登录查看全文