Development of Advanced Technologies to Reduce Design, Fabrication and Construction Costs for Future Nuclear Power Plants
[摘要] OAK-B135 This report presents a summation of the third and final year of a three-year investigation into methods and technologies for substantially reducing the capital costs and total schedule for future nuclear plants. In addition, this is the final technical report for the three-year period of studies.
[发布日期] 2002-11-30 [发布机构] Framatome-ANP DE and S (United States)
[效力级别]  [学科分类] 
[关键词] Cost;Management;Schedule;Schedules Construction;Capitalized Cost [时效性] 