已收录 268921 条政策
 政策提纲
  • 暂无提纲
Configuration Management Plan for Long Length Contaminated Equipment Receiver and Transport Trailers
[摘要] Long Length Contaminated Equipment Removal System Receiver Trailer and Transport Trailer require a configuration management plan for design, requirements and operations baseline documents. This report serves as the plan for the Trailers.
[发布日期] 2000-05-01 [发布机构] CH2M Hill Hanford Group, Inc.
[效力级别]  [学科分类] 
[关键词] Haulage Equipment;Radioactive Materials;11 Nuclear Fuel Cycle And Fuel Materials;Equipment;Contamination [时效性] 
   浏览次数:44      统一登录查看全文      激活码登录查看全文