已收录 268921 条政策
 政策提纲
  • 暂无提纲
Programmatic Baseline Summary for Phase 1 Privatization for the Tank Farm contractor
[摘要] The document describes the systematic integrated baseline planning process and provides a summary of the Tank Farm Contractor scope, schedule and cost analysis developed in support of the Phase 1 privatization mission.
[发布日期] 2000-04-22 [发布机构] CH2M Hill Hanford Group, Inc.
[效力级别]  [学科分类] 
[关键词] Radioactive Waste Storage;Contractors;Storage Facilities;Planning;Schedules [时效性] 
   浏览次数:30      统一登录查看全文      激活码登录查看全文