已收录 268921 条政策
 政策提纲
  • 暂无提纲
REMEDIATION FACILITY WORKER DOSE ASSESSMENT
[摘要] The purpose of this design calculation is to estimate radiation doses received by personnel in the Remediation Facility performing operations to receive, prepare, open, repair, recover, disposition, and correct off-normal and non-standard conditions with casks, canisters, spent nuclear fuel (SNF) assemblies, and waste packages (WP). The specific scope of work contained in this calculation covers both collective doses and individual worker group doses on an annual basis, and includes the contributions due to external and internal radiation. The results of this calculation will be used to support the design of the Remediation Facility and provide occupational dose estimates for the License Application.
[发布日期] 2004-02-27 [发布机构] United States. Department of Energy. Yucca Mountain Project Office.
[效力级别]  [学科分类] 
[关键词] Repair;License Applications;Personnel;Casks;Wastes [时效性] 
   浏览次数:39      统一登录查看全文      激活码登录查看全文