已收录 268921 条政策
 政策提纲
  • 暂无提纲
Single Shell Tank (SST) Interim Stabilization Project Plan
[摘要] This project plan establishes the management framework for the conduct of the CHG Single-Shell Tank Interim Stabilization completion program. Specifically, this plan defines the mission needs and requirements; technical objectives and approach; organization structure, roles, responsibilities, and interfaces; and operational methods. This plan serves as the project executional baseline.
[发布日期] 2000-05-22 [发布机构] CH2M Hill Hanford Group, Inc.
[效力级别]  [学科分类] 
[关键词] Radioactive Waste Storage;Program Management;Stabilization;Remedial Action;11 Nuclear Fuel Cycle And Fuel Materials [时效性] 
   浏览次数:45      统一登录查看全文      激活码登录查看全文