INTEC CPP-603 Basin Water Treatment System Closure: Process Design
[摘要] This document describes the engineering activities that have been completed in support of the closure plan for the Idaho Nuclear Technology and Engineering Center (INTEC) CPP-603 Basin Water Treatment System. This effort includes detailed assessments of methods and equipment for performing work in four areas: 1. A cold (nonradioactive) mockup system for testing equipment and procedures for vessel cleanout and vessel demolition. 2. Cleanout of process vessels to meet standards identified in the closure plan. 3. Dismantlement and removal of vessels, should it not be possible to clean them to required standards in the closure plan. 4. Cleanout or removal of pipelines and pumps associated with the CPP-603 basin water treatment system. Cleanout standards for the pipes will be the same as those used for the process vessels.
[发布日期] 2002-09-01 [发布机构] Idaho National Laboratory
[效力级别]  [学科分类] 
[关键词] Removal;Testing;Mockup;Pipelines;Process Design [时效性] 
   浏览次数:43      统一登录查看全文      激活码登录查看全文