Engineering Task Plan for Development and Fabrication and Deployment of Nested Fixed Depth Fluidic Sampling and At Tank Analysis Systems
[摘要] This engineering task plan identifies the resources, responsibilities, and schedules for the development and deployment of a mobile, variable depth sampling system and an at-tank analysis system. The mobile, variable depth sampling system concept was developed after a cost assessment indicated a high cost for multiple deployments of the nested, fixed-depth sampling system. The sampling will provide double-shell tank (DST) staging tank waste samples for assuring the readiness of the waste for shipment to the LAW/HLW plant for treatment and immobilization. The at-tank analysis system will provide ''real-time'' assessments of the samples' chemical and physical properties. These systems support the Hanford Phase 1B vitrification project.
[发布日期] 2000-10-30 [发布机构] CH2M Hill Hanford Group, Inc.
[效力级别] [学科分类]
[关键词] 12 Management Of Radioactive Wastes, And Non-Radioactive Wastes From Nuclear Facilities;Sampling;Wastes;Schedules;Tanks [时效性]