已收录 268921 条政策
 政策提纲
  • 暂无提纲
Flexible stadium design in the context of Olympics and Post-Olympics usage
[摘要] The design of the London Olympic Stadium for the 2012 Summer Olympic Games represented a shift in traditional stadium design for major sport events on the scale of the Olympics or World Cup. Emphasising design with a focus towards post-Olympics usage, the London Olympic Stadium through features like a demountable second seating tier, reclaimed steel elements, and structurally isolated fagade, set a strong precedent for flexible Olympics stadium construction. The goal of this thesis is to quantitatively explore options to push the boundaries of flexible stadium design, easing the renovation process required to transition stadiums from Olympics to post-Olympics usage. Through case study design examples, this thesis explores the effect bolted rather than welded connections can have on the design of stadium grandstands. Evaluated for both strength and serviceability, this thesis applies work demonstrating the pros and cons of bolted connections in traditional braced frame structures to stadium grandstands. Finally, this thesis explores the opportunity events like the Olympics provide to perform a probabilistic performance based design on an elliptical roof truss system. Given current building codes specify loads intended for use in the design of permanent structures, this thesis breaks down building code methodology in an attempt to determine loads more appropriate for use in the design of buildings with intended life spans on the order of an Olympic cycle (four years). Looking specifically at a stadium structural system typically controlled by wind and snow loads, this thesis attempts to quantify the material savings possible when designing a structure using performance rather than code based design.
[发布日期]  [发布机构] Massachusetts Institute of Technology
[效力级别]  [学科分类] 
[关键词]  [时效性] 
   浏览次数:3      统一登录查看全文      激活码登录查看全文