已收录 268921 条政策
 政策提纲
  • 暂无提纲
THE NEW CERN-ISOLDE ONLINE MASS-SEPARATOR FACILITY AT THE PS-BOOSTER
[摘要] The ISOLDE on-line isotope separators have been operated since 1967 at the CERN-SC. This 600 MeV proton synchro-cyclotron had to be shut down in December 1990 after 33 years of service and it was decided to move ISOLDE to a new experimental area. The new on-line mass-separator facility is now under construction at the CERN PS-Booster. This accelerator provides an average current of about 2-mu-A of 1 GeV protons in very short high intensity pulses at low repetition rate. The beam can hit either one of the two target stations, the general purpose separator (GPS), a reconstructed ISOLDE-2 type machine (which can deliver beams simultaneously into three beam lines), and the high resolution separator (HRS), which is essentially the slightly modified ISOLDE-3 separator. The central GPS beam line and the HRS feed a common beam transport system to which most of the experiments will be connected. The new facility will be taken into operation in spring 1992.
[发布日期] 1992-08-01 [发布机构] 
[效力级别]  Proceedings Paper [学科分类] 
[关键词]  [时效性] 
   浏览次数:3      统一登录查看全文      激活码登录查看全文