已收录 268921 条政策
 政策提纲
  • 暂无提纲
Determine the Post-Construction Settlement of the Embankment and Its Foundation for the Lom Pangar Dam in Cameroon
[摘要] This paper has as purpose to show the calculations done to determine the settlement of the embankment and its foundation after construction, when the empty dam is then filled with water. The calculation of the settlements will help us to estimate the value of the boom (extra height) to be added with respect to the actual height of the crest of the dam, the aim being that with time the boom will compensate for the post-construction settlement thereby maintaining the freeboard.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 
[关键词] settlement;embankment;backfill;foundation;boom. [时效性] 
   浏览次数:3      统一登录查看全文      激活码登录查看全文