Construction of dams using the hydraulic fill method, discussion of the methodology of the Tailings Storage Facility Zelazny Most
[摘要] The hydraulic fill method of erecting dams was characterized. The main assumptions and practical aspects of sand spigot were discussed on the example of the spigot of the dam body of the Zelazny Most Tailings Storage Facility (TSF). The advantages and disadvantages of the method are discussed, and the directions of attempts to implement pipelines rising along with sedimenting waste are presented, which are to reduce earthworks.
[发布日期] [发布机构]
[效力级别] [学科分类] 建筑学
[关键词] hydraulic fill;Zelazny Most;tailings [时效性]