已收录 268921 条政策
 政策提纲
  • 暂无提纲
Delay factors in the construction of irrigation and hydropower projects in Vietnam
[摘要] Irrigation and hydropower are among the most important sectors in the construction industry that propel the economic needs of a developing country like Vietnam. The construction of these projects often suffers from severe delays, leading to financial losses and other negative impacts on the economy. This paper aims to determine delay factors in the construction of these projects. Among many, 39 most important candidates of delay causes were identified from the literature review. Further surveys on project participants were conducted for the severity of these causes. An exploratory factor analysis was utilized to identify latent factors that cause delays in construction projects. The analysis result categorized a few groups of factors such as abnormal factors on the construction site (e.g., labor accidents, hydrology, water flow, extreme weather) and technical factors related to the construction contractor (e.g., unsuitable schedule, outdated construction technology, unprofessional workers) that have the greatest impact on the delay in construction of irrigation and hydropower projects in Vietnam. These findings contribute to the body of knowledge of project management and risk management, hence an improvement in the efficiency of the project sectors’ performance.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] hydropower;irrigation;construction;projects;delay factors;Vietnam [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文