已收录 268922 条政策
 政策提纲
  • 暂无提纲
PMBoK vs. PRINCE2 in the context of Polish construction projects: Structural Equation Modelling approach
[摘要] This paper discusses the approaches of Polish construction managers in terms of their preferences for the use of the two most popular project management (PM) standards and methodologies, namely PMBoK and PRINCE2. Our empirical survey was carried out in a group of managers and construction experts and involved 192 Polish SME companies from the Polish construction sector. The answers to the questionnaire were carefully analysed and interpreted with the use of the Structural Equation Modeling (SEM) Method. The results show what can affect the choice of management methodology, with a particular focus on such latent variables as PM flexibility, rigidity, knowledge and control. Our study provides empirical evidence which contributes to more effective management of investment projects undertaken by construction companies. The most important conclusions from our study are that PMBoK is more likely tied to flexibility and knowledge and PRINCE2 to rigidity and control. However, it does not necessarily mean that PMBoK has an advantage over PRINCE2. Simply put, the choice of the right methodology may depend on a number of other additional factors, such as: project size, its specific environmental conditions, size of a company implementing specific project, etc. Therefore, under certain conditions (e.g. for larger and more complex projects, etc.) it may be advisable to rely on the PRINCE2 methodology.
[发布日期]  [发布机构] 
[效力级别]  [学科分类] 建筑学
[关键词] PMBoK;PRINCE2;construction project management;construction sector;project management (PM);structural equation modelling;SEM [时效性] 
   浏览次数:2      统一登录查看全文      激活码登录查看全文