ESMD Risk Management Workshop: Systems Engineering and Integration Risks
[摘要] This report has been developed by the National Aeronautics and Space Administration (NASA) Exploration Systems Mission Directorate (ESMD) Risk Management team in close coordination with the Systems Engineering Team. This document provides a point-in-time, cumulative, summary of key lessons learned derived from the SE RFP Development process. Lessons learned invariably address challenges and risks and the way in which these areas have been addressed. Accordingly the risk management thread is woven throughout the document.
[发布日期] 2005-10-12 [发布机构]
[效力级别] [学科分类] 数学(综合)
[关键词] [时效性]