已收录 273714 条政策
 政策提纲
  • 暂无提纲
Interim Land Use Control Implementation Plan
[摘要] This Interim Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of the Kennedy Space Center (KSC) Contractors Road Heavy Equipment (CRHE) Area (SWMU 055; "the Site") of institutional controls that have been implemented at the Site1. Although there are no current unacceptable risks to human health or the environment associated with the CRHE Area, an interim institutional land use control (LUC) is necessary to prevent human health exposure to volatile organic compound (VOC)-affected groundwater at the Site. Controls will include periodic inspection, condition certification, and agency notification.
[发布日期] 2014-11-30 [发布机构] 
[效力级别]  [学科分类] 污染
[关键词]  [时效性] 
   浏览次数:9      统一登录查看全文      激活码登录查看全文