KSC Press Site Transformer Bldg. (K7-1205c) SWMU 074 Interim Measure Work Plan
[摘要] This document presents and discusses the Interim Measure (IM) Work Plan for the Press Site Transformer Building (K7-1205C). The purpose of the proposed IM activities is to remove soil affected with polychlorinated biphenyls (PCBs) greater than the Florida Department of Environmental Protection (FDEP) residential direct-exposure Soil Cleanup Target Level (R-SCTL) of 0.5 milligrams per kilogram and encapsulate concrete exhibiting PCB concentration greater than the Toxic Substance Control Act (TSCA) threshold of 50 milligrams per kilogram.
[发布日期] 2014-12-01 [发布机构]
[效力级别] [学科分类] 污染
[关键词] [时效性]