已收录 268921 条政策
 政策提纲
  • 暂无提纲
Land Use Control Implementation Plan
[摘要] This Land Use Control Implementation Plan (LUCIP) has been prepared to inform current and potential future users of Building M7-505 of institutional controls that have been implemented at the site. Although there are no current unacceptable risks to human health or the environment associated with Building M7-505, institutional land use controls (LUCs) are necessary to prohibit the use of groundwater from the site. LUCs are also necessary to prevent access to soil under electrical equipment in the northwest portion of the site. Controls necessary to prevent human exposure will include periodic inspection, condition certification, and agency notification.
[发布日期] 2015-12-30 [发布机构] 
[效力级别]  [学科分类] 污染
[关键词]  [时效性] 
   浏览次数:28      统一登录查看全文      激活码登录查看全文