Soil Management Plan For The Potable Water System Upgrades Project
[摘要] This plan describes and applies to the handling and management of soils excavated in support of the Y-12 Potable Water Systems Upgrades (PWSU) Project. The plan is specific to the PWSU Project and is intended as a working document that provides guidance consistent with the 'Soil Management Plan for the Oak Ridge Y-12 National Security Complex' (Y/SUB/92-28B99923C-Y05) and the 'Record of Decision for Phase II Interim Remedial Actions for Contaminated Soils and Scrapyard in Upper East Fork Popular Creek, Oak Ridge, Tennessee' (DOE/OR/01-2229&D2). The purpose of this plan is to prevent and/or limit the spread of contamination when moving soil within the Y-12 complex. The major feature of the soil management plan is the decision tree. The intent of the decision tree is to provide step-by-step guidance for the handling and management of soil from excavation of soil through final disposition. The decision tree provides a framework of decisions and actions to facilitate Y-12 or subcontractor decisions on the reuse of excavated soil on site and whether excavated soil can be reused on site or managed as waste. Soil characterization results from soil sampling in support of the project are also presented.
[发布日期] 2007-04-01 [发布机构] 
[效力级别]  [学科分类] 自然科学(综合)
[关键词] CONTAMINATION;CONTRACTORS;DRINKING WATER;EXCAVATION;MANAGEMENT;NATIONAL SECURITY;REMEDIAL ACTION;SAMPLING;SOILS [时效性] 
   浏览次数:16      统一登录查看全文      激活码登录查看全文