已收录 268921 条政策
 政策提纲
  • 暂无提纲
Production process for advanced space satellite system cables/interconnects.
[摘要] This production process was generated for the satellite system program cables/interconnects group, which in essences had no well defined production process. The driver for the development of a formalized process was based on the set backs, problem areas, challenges, and need improvements faced from within the program at Sandia National Laboratories. In addition, the formal production process was developed from the Master's program of Engineering Management for New Mexico Institute of Mining and Technology in Socorro New Mexico and submitted as a thesis to meet the institute's graduating requirements.
[发布日期] 2007-12-01 [发布机构] 
[效力级别]  [学科分类] 
[关键词]  [时效性] 
   浏览次数:21      统一登录查看全文      激活码登录查看全文