Accelerator/Experiment Operations - FY 2008
[摘要] This Technical Memorandum (TM) summarizes the Fermilab accelerator and accelerator experiment operations for FY 2008. It is one of a series of annual publications intended to gather information in one place. In this case, the information concerns the FY 2008 Run II at the Tevatron Collider, MINOS using the Main Injector Neutrino Beam (NuMI), the MiniBooNE and SciBooNE experiments running in the Booster Neutrino Beam (BNB), and the Meson Test Beam (MTest) activities in the 120 GeV external Switchyard beam (SY120).
[发布日期] 2008-10-01 [发布机构]
[效力级别] [学科分类] 核物理和高能物理
[关键词] ACCELERATORS;FERMILAB ACCELERATOR;FERMILAB TEVATRON;MESONS;NEUTRINO BEAMS Accelerators [时效性]