已收录 273506 条政策
 政策提纲
  • 暂无提纲
Pretreatment Engineering Platform Phase 1 Final Test Report
[摘要] Pacific Northwest National Laboratory (PNNL) was tasked by Bechtel National Inc. (BNI) on the River Protection Project, Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to conduct testing to demonstrate the performance of the WTP Pretreatment Facility (PTF) leaching and ultrafiltration processes at an engineering-scale. In addition to the demonstration, the testing was to address specific technical issues identified in Issue Response Plan for Implementation of External Flowsheet Review Team (EFRT) Recommendations - M12, Undemonstrated Leaching Processes.( ) Testing was conducted in a 1/4.5-scale mock-up of the PTF ultrafiltration system, the Pretreatment Engineering Platform (PEP). Parallel laboratory testing was conducted in various PNNL laboratories to allow direct comparison of process performance at an engineering-scale and a laboratory-scale. This report presents and discusses the results of those tests.
[发布日期] 2009-12-23 [发布机构] 
[效力级别]  [学科分类] 核能源与工程
[关键词] AR FACILITIES;FLOWSHEETS;IMPLEMENTATION;LEACHING;PERFORMANCE;RECOMMENDATIONS;PERFORMANCE TESTING;ULTRAFILTRATION;RADIOACTIVE WASTE PROCESSING;PROCESS DEVELOPMENT UNITS Pretreatment Engineering Platform;ultrafiltration;leaching;caustic leaching [时效性] 
   浏览次数:54      统一登录查看全文      激活码登录查看全文