Scale-Up, Production, and Procurement of PEP Simulants
[摘要] Pacific Northwest National Laboratory has been tasked by Bechtel National Inc. on the River Protection Project-Hanford Tank Waste Treatment and Immobilization Plant (RPP-WTP) project to perform research and development activities to resolve technical issues identified for the Pretreatment Facility. The Pretreatment Engineering Platform (PEP) was designed, constructed, and operated as part of a plan to respond to issue M12, “Undemonstrated Leaching Processes.” The PEP is a 1/4.5-scale test platform designed to simulate the WTP pretreatment caustic leaching, oxidative leaching, ultrafiltration solids concentration, and slurry washing processes. The PEP replicates the WTP leaching processes using prototypic equipment and control strategies. This report provides the lessons learned regarding the manufacture and delivery of simulated feeds for PEP testing.
[发布日期] 2009-10-29 [发布机构] 
[效力级别]  [学科分类] 核能源与工程
[关键词] AR FACILITIES;PROCESS DEVELOPMENT UNITS;RADIOACTIVE WASTE PROCESSING;HANFORD RESERVATION;RADIOACTIVE MATERIALS;SIMULATION;LEACHING;PROCUREMENT;ULTRAFILTRATION;WASHING;PERFORMANCE TESTING PEP;simulants [时效性] 
   浏览次数:19      统一登录查看全文      激活码登录查看全文