Time Delays, Bends, Acceleration and Array Reconfigurations
[摘要] This note was originally one of the parts of the work on a 50 MeV and 500 MeV Rb{sup +} driver and part of work on delay lines for a 60 GeV U{sup +12} driver. It is slightly expanded here to make it more generally applicable. The emphasis is on beam manipulations such as joining and separating beams at the two ends of a driver and providing various time delays between beams as required by the target.
[发布日期] 2011-06-24 [发布机构]
[效力级别] [学科分类] 核物理和高能物理
[关键词] ACCELERATION;TIME DELAY;LAWRENCE BERKELEY LABORATORY [时效性]