Initial Configuration of Acceleration for the IDS-NF Neutrino Factory
[摘要] The IDS-NF neutrino factory acceleration system must accelerate the muon beam coming out of cooling to a total energy of 25 GeV. The parameters of the beam being accelerated are given in Table 1. While a certain fraction of the beam will be lost early in acceleration, losses of the beam that falls within the acceptance (see Table 1) should be dominated by decay losses (as opposed to dynamic losses or losses on apertures). Decay losses will be kept small, and the cost of the machine will be reduced to the extent possible, consistent with the above requirements. There is a tradeoff between machine cost and the amount of decay losses, and a reasonable compromise will be made between them. Both muon signs will be accelerated simultaneously.