已收录 273081 条政策
 政策提纲
  • 暂无提纲
Initial Configuration of Acceleration for the IDS-NF Neutrino Factory
[摘要] The IDS-NF neutrino factory acceleration system must accelerate the muon beam coming out of cooling to a total energy of 25 GeV. The parameters of the beam being accelerated are given in Table 1. While a certain fraction of the beam will be lost early in acceleration, losses of the beam that falls within the acceptance (see Table 1) should be dominated by decay losses (as opposed to dynamic losses or losses on apertures). Decay losses will be kept small, and the cost of the machine will be reduced to the extent possible, consistent with the above requirements. There is a tradeoff between machine cost and the amount of decay losses, and a reasonable compromise will be made between them. Both muon signs will be accelerated simultaneously.
[发布日期] 2011-10-01 [发布机构] 
[效力级别]  [学科分类] 核物理和高能物理
[关键词] ACCELERATION;APERTURES;CONFIGURATION;DECAY;MUON BEAMS;MUONS;NEUTRINOS [时效性] 
   浏览次数:20      统一登录查看全文      激活码登录查看全文