已收录 273693 条政策
 政策提纲
  • 暂无提纲
FEASIBILITY STUDY OF PRESSURE PULSING PIPELINE UNPLUGGING TECHNOLOGIES FOR HANFORD
[摘要] The ability to unplug key waste transfer routes is generally essential for successful tank farms operations. All transfer lines run the risk of plugging but the cross site transfer line poses increased risk due to its longer length. The loss of a transfer route needed to support the waste feed delivery mission impacts the cost and schedule of the Hanford clean up mission. This report addresses the engineering feasibility for two pressure pulse technologies, which are similar in concept, for pipeline unplugging.
[发布日期] 2012-12-20 [发布机构] 
[效力级别]  [学科分类] 核能源与工程
[关键词] Pipeline;Unplugging;Pulsing;Pressure;Pipe-Pulse;Hydrokinetics;Feasibility;Transfer Line;Recovery;Cross Site;Plugging;Pressure Pulse;Vibration;Plug;Waste Transfer System [时效性] 
   浏览次数:45      统一登录查看全文      激活码登录查看全文