已收录 267400 条政策
 政策提纲
  • 暂无提纲
Hybrid Wall Construction and Quality Control Issues in Wyandotte, Michigan
[摘要] This report is the second report on the Wyandotte NSP2 project in Wyandotte, MI and documents refinements to the design, construction, and quality control for the High R-value enclosure. The report will be of interest to designers and builders of production housing in Cold Climates. The focus of the second round of research was on using the hybrid insulation approach to develop a reliable methodof achieving consistently low airtightness numbers. There are two primary outcomes from this research. First, the airtightness measurements demonstrate that with a shallow learning curve, even new builders entering the program having little experience with the technology package are able to achieve consistent results that are less than 1.5 ACH50. Second, the process changes implemented to helpsecure these results were straightforward and ended up encouraging better communication between designer, builder, and the City officials supervising the project.
[发布日期] 2013-12-01 [发布机构] 
[效力级别]  [学科分类] 能源(综合)
[关键词] hybrid insulation;SPF;cold climate;low-rise residential;Michigan;cold;wall insulation;high-R;high-R value;enclosures;single family detached;residential;residential buildings;Building Science Corporation (BSC);Building America [时效性] 
   浏览次数:37      统一登录查看全文      激活码登录查看全文