已收录 273151 条政策
 政策提纲
  • 暂无提纲
Final Technical Report
[摘要] This work is focused on the design and construction of novel beam diagnostic and instrumentation for charged particle accelerators required for the next generation of linear colliders. Our main interest is in non-invasive techniques. The Northwestern group of Velasco has been a member of the CLIC Test Facility 3 (CTF3) collaboration since 2003, and the beam instrumentation work is developed mostly at this facility1. This 4 kW electron beam facility has a 25-170 MeV electron LINAC. CTF3 performed a set of dedicated measurements to finalize the development of our RF-Pickup bunch length detectors. The RF-pickup based on mixers was fully commissioned in 2009 and the RF-pickup based on diodes was finished in time for the 2010-11 data taking. The analysis of all the data taken in by the summer of 2010 was finish in time and presented at the main conference of the year, LINAC 2010 in Japan.
[发布日期] 2013-11-01 [发布机构] 
[效力级别]  [学科分类] 物理(综合)
[关键词] instrumentation;beam protection;accelerator technology [时效性] 
   浏览次数:36      统一登录查看全文      激活码登录查看全文