Alternatives Analysis for the Resumption of Transient Testing Program
[摘要] An alternatives analysis was performed for resumption of transient testing. The analysis considered eleven alternatives ??? including both US international facilities. A screening process was used to identify two viable alternatives from the original eleven. In addition, the alternatives analysis includes a no action alternative as required by the National Environmental Policy Act (NEPA). The alternatives considered in this analysis included: 1. Restart the Transient Reactor Test Facility (TREAT) 2. Modify the Annular Core Research Reactor (ACRR) which includes construction of a new hot cell and installation of a new hodoscope. 3. No Action
[发布日期] 2013-11-01 [发布机构]
[效力级别] [学科分类] 工程和技术(综合)
[关键词] TREAT [时效性]