已收录 273699 条政策
 政策提纲
  • 暂无提纲
Integration of SWPF into the DWPF Flowsheet: Gap Analysis and Test Matrix Development
[摘要] Based on Revision 19 of the High Level Waste (HLW) System Plan, it is anticipated that the Salt Waste Processing Facility (SWPF) will be integrated into the Defense Waste Processing Facility (DWPF) flowsheet in October 2018 (or with Sludge Batch 11 (SB11)). Given that, Savannah River Remediation (SRR) has requested a technical basis be developed that validates the current Product Composition Control System (PCCS) models for use during the processing of the SWPF-based coupled flowsheet or that leads to the refinements of or modifications to the models that are needed so that the models may be used during the processing of the SWPF-based coupled flowsheet. To support this objective, Savannah River National Laboratory (SRNL) has completed three key interim activities prior to validation of the current or development of refined PCCS models over the anticipated glass composition region for SWPF processing. These three key activities include: (1) defining the glass compositional region over which SWPF is anticipated to be processed, (2) comparing the current PCCS model validation ranges to the SWPF glass compositional region from which compositional gaps can be identified, and (3) developing a test matrix to cover the compositional gaps.
[发布日期] 2014-12-10 [发布机构] 
[效力级别]  [学科分类] 核能源与工程
[关键词] DWPF;SWPF;Glass;Test Matrix;Gap Analysis [时效性] 
   浏览次数:20      统一登录查看全文      激活码登录查看全文