已收录 274124 条政策
 政策提纲
  • 暂无提纲
Advanced probabilistic risk analysis using RAVEN and RELAP-7
[摘要] RAVEN, under the support of the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program [1], is advancing its capability to perform statistical analyses of stochastic dynamic systems. This is aligned with its mission to provide the tools needed by the Risk Informed Safety Margin Characterization (RISMC) path-lead [2] under the Department Of Energy (DOE) Light Water Reactor Sustainability program [3]. In particular this task is focused on the synergetic development with the RELAP-7 [4] code to advance the state of the art on the safety analysis of nuclear power plants (NPP). The investigation of the probabilistic evolution of accident scenarios for a complex system such as a nuclear power plant is not a trivial challenge. The complexity of the system to be modeled leads to demanding computational requirements even to simulate one of the many possible evolutions of an accident scenario (tens of CPU/hour). At the same time, the probabilistic analysis requires thousands of runs to investigate outcomes characterized by low probability and severe consequence (tail problem). The milestone reported in June of 2013 [5] described the capability of RAVEN to implement complex control logic and provide an adequate support for the exploration of the probabilistic space using a Monte Carlo sampling strategy. Unfortunately the Monte Carlo approach is ineffective with a problem of this complexity. In the following year of development, the RAVEN code has been extended with more sophisticated sampling strategies (grids, Latin Hypercube, and adaptive sampling). This milestone report illustrates the effectiveness of those methodologies in performing the assessment of the probability of core damage following the onset of a Station Black Out (SBO) situation in a boiling water reactor (BWR). The first part of the report provides an overview of the available probabilistic analysis capabilities, ranging from the different types of distributions available, possible sampling strategies, and post processing analysis capabilities. The first part of the report provides an extensive description of two major developments introduced this year: adaptive sampling for limit surface sampling and multi variate distributions. The document concludes with a description of the demo case (BWR-SBO) and a discussion of the results obtained.
[发布日期] 2014-06-01 [发布机构] 
[效力级别]  [学科分类] 数学(综合)
[关键词] probabilistic risk;RAVEN [时效性] 
   浏览次数:15      统一登录查看全文      激活码登录查看全文